Our company have completed in the year 2018, the Railway Track Linking along with OHE (Over Head Electrical works) of M/s Adani Tracks Management Services Pvt Ltd. (Formerly, Sarguja Rail Corridor Pvt. Ltd. for 60 track KM of Railway Siding. The value of completed works exceeds from Rs 47.93 Crore to Rs 72 Crore.
Our  company EBPL  also  promoted  one  more  company  named  Durga  Hitech  Projects  Pvt.  Ltd.  in  Joint Venture  with  our  associate  company  M/s  Durga  Continental  Pvt. Ltd.  for  execution  of  major  infrastructure  projects.  DHPPL   received  a  contract  of  worth  Rs.  52 crores  from  L & T, Chennai  for  developing  a  complete  private  railway  siding  of  25  km  for  Sonadih  Cement  Plant, Nuvoco Vistas Corp. Ltd. (formerly, Lafarge  India  Pvt.  Ltd.).  The  complete  work  included P. Way  works,  construction  of  major  &  minor  bridges,  complete  OHE &  S&T  works  being  executed  in  close  supervision  of  SECR, Raipur. The works was completed for a value of  70 Crores and the completion  certificate  issued by L&T in the year’2015 is  available with us .
Our company also completed a Railway Signaling & Telecommunication project for Bangladesh Railway under GDCL for an value of Rs. 12 Crore. All major materials  including all Signaling materials  like Electronic Interlocking  materials  were sent overseas from India to Bangladesh.
The  company  has  bagged in  Oct’2008  a contract  of  25  KV OHE Traction  Line  for  Private  Siding  of  Ambuja Cements  Ltd., for  Rs. 1200  Lacs (Twelve  Hundred  Lacs ) & had completed  successfully whose line  charging  was  done on 19.04.2011 with  final  value  of  Rs.  12  Crores.  The  certificate  to  this  effect  is  available with us. We  have  also  completed  OHE  works  of  South  East  Central  Railway directly  under  our  company name  for  Dipika siding  work  for  an  amount Rs. 2 Crores &  successfully commissioned  in  Jan 09.
The Company  also executed the Transmission Line Works of 220KV , 132 KV  for more than 100 KM in CSPTCL ,Chhattisgarh State Power Transmission Company Limited(formerly, CSEB) and are receiving regular orders from their clients in various fields of Electrical Engineering Discipline. The company also started designing the Extra High Tension Transmission lines and Extra High Voltage Substations of 132 KV and 220 KV range Voltages. The Completion certificate of EHV  transmission lines for  more than 100KM  Line length is available with us.
We have  also completed the works of  220 KV Construction of Transmission line at Mopka  for a line length of 13 KM near Seepat Road at Bilaspur, the works of 132 KV lines at Baloda Bazar for a length of 22 KM, 220 KV DCDS LILO line of 220 KV  Korba (E) – Bhilai line for a line length of 7 KM, 132KV DCDS line from Simga to Tilda for length of 7 KM, 132 KV  DCDS LILO line of Bhilai – Balaghat  132 KV S/s Damdha for a line length of 30KM. We have also  completed the  220 KV transmission line  of CSPTCL from PGCIL S/S to Doma 220 KVS/s for 22 km and was commissioned by us in July 2010. The completion certificate for all these lines totaling to about 113 KM is available with us.
The company also executed civil and Mechanical Erection works in various areas. Shri Ajay  Agarwal had executed many civil works and Mechanical works in DURGAPUR STEEL PLANT and BHILAI STEEL PLANT  for last 26 years after graduation in Engineering. Very heavy civil works and Structural Engineering Works during the modernization of Steel Plants was carried out by Shri Ajay  Agarwal under his direct supervision.
The firm also worked with TPE / Crompton Greaves Ltd., in Raw Material Storage and Handling system in OHP at SP-3, Bhilai Steel Plant. The work consisted of PLC erection, Data Highway cable, UPS, Panels and Relay Interlocking works in System Integration works was  completed in the year’2001.
In this Extra High Tension field the  company  bagged  and  completed  successfully  order for Complete Design, Supply and Erection with testing and commissioning of the 132 KV Transmission lines for 2 KM at their Plant premises at Abhijeet  Infrastructure Ltd., Near NECO Jayaswals at Siltara, Raipur. They also issued similar order for their company Corporate Ispat Alloys Ltd., with complete supply, Erection and  commissioning of the EHV line for an value of Rs 190 lakhs which was completed in Dec’2007.
Also the company completed the 11 KV Ring Main System in the Joint Venture of & SAIL called BESCL wherein they have planned to set up a Power Plant of 2×250 MW Expansion at Bhilai, in which the firm executed the works.
We also  received  a  prestigious  contract  of  Rs. 600 Lacs  from  Lafarge  India  Pvt.  Ltd.  for diversion of  their Power  Line  Crossings  falling  across  the  new  proposed  railway  track  from  Sonadih  Cement Plant  to Nipaniya  Station and the work was completed.
EBPL also received the Project from TATA Projects Ltd. of Optical Fibre Cable laying works in area Kabirdham / Kawardha of Chhattisgarh State  and  completed in the year ‘2019  for  an value of 3.75 Crore.
EBPL also had an overseas experience of Signaling and Telecommunication works executed in Bangladesh Railways at Akhura junction, Distt. Brahman Bariya of Bangladesh for  an value of Rs 12 Crores  commissioned in the year 2018